The boiler
exam guide.

At 75 boiler horsepower, which role fits a Special Engineer license? Compare two assignments, read a simulated gauge and plan for the state exam.
Start the first assignmentSpecial Engineer license limits
Assume the engineer already holds a Minnesota Special Engineer license. Compare the plant’s rated boiler horsepower with the limit for the stated role. A rating exactly at the limit qualifies for that role.
- Engineer in charge
- 50 boiler hp
- Shift engineer
- 100 boiler hp
A licensed Special Engineer may also serve as an apprentice in a plant of any size under the direct supervision of a properly licensed engineer. For applicants aged 16 or 17, subdivision 15(b) requires enrollment in a course approved by the commissioner.
Minnesota Statutes § 326B.978, subd. 15Try both roles on paper
An adult license holder is assigned to a 75 boiler hp plant. Would each role fit?
Check both assignments
Shift engineer fits because 75 is within 100 boiler hp. Taking charge would exceed the 50 boiler hp limit.
What does the instrument tell you?
Four self-checks cover component names, measurement units, and the differences between two illustrated boilers. Answer each question before opening its explanation.
A study card shows “pressure gauge” and “psig.” Which goes after the number 8?
8 psig. The pressure gauge is the instrument. Its scale gives the measurement in pounds per square inch gauge, abbreviated psig.
DLI Special Engineer material, p. 2A glass tube shows a water line. A round dial beside it has a pointer. Which shows water level?
The sight glass, also called the water glass, shows the water level. The steam pressure gauge in the drawing is a separate instrument. Its pointer indicates pressure.
DLI steam drawing, item 5 and water-level noteA hot-water dial has one scale in °F and another in psi. What two quantities belong in its caption?
Water temperature and pressure. Pair °F with temperature and psi with pressure. Item C in the hot-water drawing identifies a combination gauge. Each scale needs its own quantity and unit.
DLI hot-water drawing, item CA drawing shows an expansion tank and two aquastats. Which of DLI’s two boiler drawings matches those labels?
The hot-water boiler. In that drawing, A identifies the expansion tank and D and E identify the aquastats. The steam drawing labels a steam pressure gauge at 5. Both drawings include a low-water cutoff, so that label alone fits either one.
Compare DLI’s steam and hot-water drawingsRead next
Compare the steam and hot-water sections in DLI’s engineer task list. For broader study, find the state study material, Safe Boiler Operation Fundamentals, and Low Pressure Boilers on DLI’s Special Engineer reading list.
What goes in the practice log?
Read the simulated dial and write down a number with its unit. For work on actual equipment, follow site procedures and qualified supervision.
Check this reading
14 psig. Five spaces cover 10 psig, so each space is 2 psig. The needle is two spaces past 10.
From application
to exam day.
The Minnesota Department of Labor and Industry (DLI) approves applications, schedules exams and issues licenses. Boiler Ledger provides independent desk practice for exam preparation.
State sources checked . Check DLI for current fees and available dates.
- Gather your reading.
DLI lists a Special Engineer study packet and two textbooks. Use the packet for study and check legal requirements in the current Revisor text.
- Apply for the Special Engineer exam.
Submit a signed application and the $50 application and exam fee. This class requires no previous operating experience. DLI’s application waives the experience affidavit for Special Engineer applicants.
- Choose an exam sitting.
After approval, DLI emails instructions for choosing an available date and location in iMS. The boiler exam has a 2.5-hour limit and requires at least 70% to pass. The exam is normally written. The rule provides for an oral Special Engineer exam if an applicant cannot read or write.
- Obtain your license.
After passing, pay the separate $20 Special Engineer license fee before DLI issues the license.
Count the days
between.
If your employer requires a license by a particular date, ask which day counts and what documentation they accept. Compare that deadline with your planned exam date.
This comparison counts calendar days. It cannot predict an available sitting or when DLI will issue a license.
To compare on paper, subtract the exam date from the employer’s last eligible day. A negative number means the exam falls after the deadline.